I’ve been working on Dear Jane blocks during basketball games – both my team (Cleveland Cavs) and my husbands team (Miami Heat) are in the playoffs, so we have a lot of games to watch! I’m getting a lot better at the applique I think, I keep prepping them to work on during games. I’ve now completed 59 blocks and 2 triangles and I have at least 4 more in-process. I probably won’t get back to working on them until toward the end of the week, Dr appt this week and a funeral to attend (friends dad died over the weekend).
Another Dear Jane Update
![](https://i0.wp.com/www.kellyskwilts.com/wp-content/uploads/2010/04/D-05.jpg?fit=997%2C975&ssl=1)