Design Wall Monday – 03-06-17

Commission Progress 030617.jpgI started working on the last 2 commission quilts for my friend. I got all of the blocks cut out and put together for both quilts, I just need to get them put together. These quilts go together so quickly that I don’t mind that I’ve made so many of them. My friend is coming to visit this weekend, so I’d like to have the tops done before she gets here.

Good Night Irene 030617While I work on the commission quilts, I’m working on the border blocks for Good Night Irene, which has been in progress since 2014. I slowly worked on the top during 2014, but it was hard with a newborn in the house. The border blocks are just simple 9 patches, and use 162 white squares and 162 colored squares. My 2.5″ square bin doesn’t even look any emptier! I finished half the blocks needed, I hope to finish the other half today.

Cassie 030617Cassie is LOVING playing with fabrics. She asks at least once a day if she can play with them. Sometimes she wants the 2.5″ square bin, sometimes she wants “her fabrics”. I have a container full of fabrics I’ve collected for her, including 3-4 Minnie Mouse fabrics. At some point I’ll make something with them, haven’t decided yet what it will be. I might wait until she gets her big girl bed and make a large quilt like I did for Alex. Her birthday is in 2 weeks and she’ll be 3, I still can’t believe how fast the last 3 years has gone by! I bought her some Minnie Mouse sewing cards for her birthday, I’ll start her sewing with something easy for her little hands.

Linking up with Patchwork Times.

Dear Jane Update and March OMG

B6
B6

I finished the last block in Row B!! This one too awhile, so many tiny pieces! I spent a lot of time this week working on prepping Row C, picking the colors is fun, I’m trying to spread them out in the rows. Once I finished B6, I finished putting together Row B with the sashing and then I put Rows A and B together. OMG I am loving how it looks! I started piecing the first block of Row C yesterday while I was waiting for Alex’s bus and I would have worked on it more last night, but by the time we got home from Mother/Son night at his school I was exhausted!

Row A-B

Good Night Irene 071015I did a good job on my February OMG, now it’s time to chose March’s goal(s). This is a busy month for us, every weekend is booked – out of town guest next weekend, Cassie’s birthday party the following weekend. I think I’ve decided that my goals this month are to finish the border on my Good Night Irene quilt (started in 2014, centered completed July 2015) and to get Hexagon Diamonds basted. I really want to start quilting it and get it finished this year, it’s been sitting here waiting since July 2014! I have the backing and black batting, I just need to baste! I should be able to do it during the day on guild day, since we have the building all day and there are lots of large tables. I’m pretty sure I can work on Good Night Irene border blocks while I work on the last 2 commission quilts that need to be done in the next month or so (still waiting for a due date). Hexie Diamonds 123115

Linking up to Elm Street Quilts and Crazy Mom Quilts.

OMG and Dear Jane

Circle Table Runner 022617I’m not sure how, but I managed to finish the 2 items I wanted to for my One Monthly Goal!

So last year I made the Circle Table Runner for the kitchen island. I didn’t have time to get it quilted before Alex’s birthday so I just threw it on the island for the party. Of course it got food and icing from the cake on it. Now that it’s finally quilted I can throw it in the wash tomorrow when I do laundry. I decided to try stippling, each block was done before moving on to the next one. It’s not all good looking or perfect, but it’s not straight line quilting! I’ll keep practicing on some of my other quilts that need to get done this year!

Pinwheel Table Topper 0226172008. That’s when the pinwheel topper was pieced and set aside. I have another in red, white and blue that is in our half bathroom on a corner table, I think I found the pattern in a Fons and Porter magazine. It’s simply quilted, but again nothing straight line. lots of curves in the black areas. It’s hard to see in the picture since I used black thread. I have no clue what I’m going to do with it, but I’m sure I’ll find a place for it eventually.

I’m really happy that I not only managed to finish the 2 items that I set as goal for the month, but they both are also on my 2017 UFO Challenge list. I showed the pinwheel quilt at guild in February because I finished it early in the month, the runner will go for show and tell in March. I have a few days (I hope!) to figure out what my March goal(s) will be, little girl has a birthday and we have plans almost every weekend.

B11
B11

I just finished B11 and I only have 1 more block in Row B to finish. I’ve been prepping Row C on and off all day today, hoping I have enough glue in the pen to get it done since my order with refills won’t arrive until the end of the week. I think Row D will be shipping soon, I’m almost caught up! Planning on vegging in front of the tv tonight after the kids go to bed, maybe I can get the hubby to start me another fire and get to working on B6.

Linking up to Elm Street Quilts and Slow Stitching Sunday

Latest Dear Jane Update

I’ve gotten 5 more blocks done this week! I have 2 blocks left to finish, I wasn’t feeling well a few days this week so I didn’t finish them, but I did get the next one started last night. I was having problems getting all the pieces to fit on B7, so I had to put the sashing on and then finish putting the last 2 pieces on. For some reason I had problems with B12 as well and just turned that center square so it would fit.

I’m trying to work on my 2nd OMG project for the month, I got one finished pretty quickly early in the month. I had about 7 blocks quilted and realized I didn’t like the design I had chosen and needed to take it all out and do something different. I just started requilting it before I got Alex from the bus and I like the new design I’ve chosen. Hoping to get it finished this weekend, I have a project for my dad I need to work on too!

Slow Stitching Sunday

I plan on doing some machine quilting today, but later tonight while the kids play and after they go to bed I will be relaxing in my chair working on more Dear Jane EPP blocks. Yesterday I finished up all the basting on Row B (except for the missing pieces on B6 that are being mailed) and I managed to finish 2 blocks last night while I caught up on shows with the hubby. I enjoy watching tv with him and being able to work on a project that means something to me. Right now it’s either Dear Jane EPP, hexie insanity or knitting – although I haven’t worked on any knitting in awhile!

I have a table runner to quilt, and I’m thinking of trying to stipple or meander – I did a little of it yesterday when I made a zipper pouch for Alex and I think I can make it look halfway decent. I also have to finish unpinning and rebasting a charity quilt that I started last week. I had it all the way basted and realized that it wasn’t lined up properly, the backing just wasn’t right. I’ll quilt that one with all straight lines because it doesn’t need anything more, it’s just a simple top!

Linking up to Slow Stitching Sunday.


Updates!

Rainbow hexie swap 021717I mentioned a couple of weeks ago that I was participating in some hexie swaps on Instagram. The other night I finished basting the Rainbow Swap hexies and I’m just waiting for all the information for shipping (swap hasn’t actually closed yet!). I can’t wait to see what’s coming back to me, I actually have some ideas for a project for these hexies, but nothing is firm yet. I really didn’t need another swap, BUT it’s an addiction and I signed up for another one. Fabrics have been pulled and approved, cut up and pinned to the papers and are ready to be basted as time permits. 80 more hexies that will be added to my collection!

Hexie Insanity 021717Since I was already prepping hexies for the swap I decided to get some more ready for basting for Hexie Insanity, which hasn’t been touched in awhile. I pulled all the completed diamonds out and made sure my spreadsheet was correct as to how many of each color I have completed. I need to make 5 of each color to have enough for the project. I love how this is going to look when it’s all sewn together!

I’m moving along on Dear Jane EPP, Row B has been started and 4 blocks are now completed. I’m working on pulling the fabrics and prepping pieces for the rest of the row today, I found some papers missing for B6 and paperpieces.com is going to be sending me replacements. I like working with companies like this, they are SO helpful!!

Cassie fabrics 021717Last week I ordered some neutral Moda Marbles for the Dear Jane quilt backgrounds. I already had some that I’ve been using and wasn’t sure which color it was so I ordered 2 that looked pretty close. Turns out I actually ordered the 2 colors that I have and I’m going to be mixing between the 2 as backgrounds for the blocks. Anyway, Cassie wanted to play with the brand new fabrics that came Wednesday and I didn’t want her messing with them, but I said she could play with my 2.5″ square bin. She loved it! She was sorting colors, picking colors out and showing me what it was in sign language (she’s learning it in day care) and just plain having fun. Hopefully one day she’ll be a quilter like mommy, but it’s totally up to her!

Linking up to Sarah Did it! and Crazy Mom Quilts.

Design Wall Monday – February 13, 2017

A12
A12

So last night I finished the last block in Row A, A12. I was quite happy with how it turned out and it went really fast. So I started right in and worked on adding the sashing and cornerstones and attaching it to the rest of the row. I’m happy to say that Row A is completely done! I need to start taking the papers out and I want to label each piece as I take them out in case I decide to make another one of these in the future! Since I figured I’d finish the row last night I spent a little bit of time yesterday afternoon working on prepping the next 2 blocks of Row B. They both look to be easy blocks, in fact the first one is applique and should go pretty fast. I’ll have to see if I can prep the sashing and cornerstones today so that it’s all ready for the blocks. I like putting them all on as I go, so I don’t have to do it all at the end. Looking at the rest of Row B, I hope I can get them done quickly and get started on Row C so I can catch up before the next row gets here. I think the hardest part is picking out the fabrics for the blocks! I have so many Moda Marbles to use that it’s hard to decide what I want to use for each block. I just started signups for the Fat Quarter Exchange at guild and I have requested Moda Marbles, so maybe I can get some more colors to use! I now have 2 quilts that I’m using these fabrics for, the Dear Jane EPP and my hexagon insanity quilt. I’ve been so busy with Dear Jane that I haven’t worked on hexie insanity in awhile. If I can get caught up then I’ll have time to work on that again.

Row A

Linking up to Design Wall Monday at Patchwork Times.

Dear Jane EPP Update

I have more blocks done!! 🙂 I’ve been working hard this last week to get Row A finished and I’m happy to say I have only 1 block left to do. It’s all prepped, I just need to sit down and work on it. I finished up A9 last night and I LOVE how it looks! In fact I’m loving the whole row! Looking forward to moving on to Row B, I’m behind since Row C just got here this week. But that’s ok, I’m just having fun picking out the fabric for each block as I go. I hope to have another update in the next day or so with the entire row put together.

Linking up to Slow Sunday Stitching over at Kathy’s Quilts.

Hexie Swaps

xoxohexieswap 020417I got some squishy mail today! Oh I love some of the hexies I got from the XOXOHexieSwap! My absolute favorite is the one with the cat (top middle) and the skeleton heart one next to it. These will be added to my pile of Valentine squares that I bought on ebay a couple of years ago. Recently at Joann’s I found a couple of cute fabrics for Valentine’s Day that were on sale and I bought a quarter of a yard of each of them for hexies. Some day when I have time (HA!) I will put all of these together into a wallhanging for the holiday.

floralshexieswapThursday I mailed out the hexies for the floralshexieswap, they should be there on Monday. I won’t see those back for 2-3 weeks I think. I didn’t think I had that many floral fabrics – but I found some in in 2.5″ square bin and some yardage in the cupboard. I even had enough to make sure that some of the fabrics were made into hexies for me to go with the ones that come back!

Rainbowswap2 020417 As if I didn’t have enough hand work to do, I signed up for another hexie swap this week. This one is a rainbow swap and I signed up for 2 sets. I posted this on Instagram once I had all my colors pulled and cut out. I haven’t started basting them yet, the shipping deadline is April 10th, so I have plenty of time!

Off to keep working on Valentine’s items for the kids parties at school!

Dear Jane EPP – One Monthly Goal

A2
A2

I’ve been busy working on Dear Jane EPP blocks and finished another one last night. 40 pieces in this block, but it wasn’t too hard. I have A1 prepped and last night I got all the sashing and cornerstones prepped for this row. I got an email yesterday that Row C has shipped, I have a total of 5 blocks left in Row A! I’m not worried about the rows, I’m just going to keep working on them as I can and hopefully I’ll catch up soon!

floralshexieswapI also finished working on basting hexies for the FloralsHexieSwap that I signed up for recently. 30 hexies that I mailed today to Utah to the swap leader. Can’t wait to see what comes back! I’m thinking of signing up for another swap, this time it’s a rainbow swap. I need to see if I have the 6 colors needed and they need to read as solid. Hopefully tomorrow I’ll be able to look through the stash and see what I have, I have until February 20th to make a decision.

Pinwheel tabletopper
Pinwheel Table Topper

I’ve seen quite a few people posting about One Monthly Goal (OMG) lately, so I decided that maybe I needed to do it too! So based on my UFO list for guild, I’m going to say that this months goal is to get the pinwheel table topper  (made in 2008!) and the circle table runner (made last year) quilted. The pinwheel table topper is already pinned and ready to be quilted, and I’ve already cut backing and batting for the table runner, it just needs pinned and quilted. I can’t wait to get the runner finished, I had it on the breakfast bar last fall during Alex’s birthday party and it got icing on it, and I can’t wash it until it’s quilted! Linking to Elm Street Quilts.

Circle Table Runner 020217
Circle Table Runner