Scrappy Finish

While I was waiting for some wide backing to arrive for my plaid-ish quilt, I pulled out my scrappy 9-patch quilt top from 2013 and figured I could get it done quickly. Yep I was able to easily do that! the kids never let new quilts sit for long before they are being claimed. I don’t know what they do with all these quilts but they love when I finish them! Most of this quilt is made from the 2.5″ square bin, I swear that bin just doesn’t go away no matter how many quilts I make from it!

The next quilt to be worked on is plaid-ish, wide backing is supposed to be here today, I can’t tell from the tracking if it will be or not. Since it’s such a large quilt I told the kids it’s going to the trailer and they can use it for picnics, fireworks, etc. Hoping to have it finished by the weekend, we’ll see how quick I get it quilted.

I need to get a little more finished on the hexagon quilt I’m working on so I can get pictures and get everything detailed here. Haven’t worked on it the last couple of days since I was working on binding. So be back soon!

Cassie’s Quilt Done!

Cassie’s quilt, started in 2019 is finally finished and on her bed! She’s loving it and keeps saying how cozy and warm it is. The backing is totally pieced together from 3 blocks I picked up from the free table at guild, 2 yards of Effie’s Woods by Deb Strain, a couple of mini charm packs of Effie’s Woods and a regular charm pack of Effie’s Woods. Of course that wasn’t close to enough, so I grabbed a couple of Harry Potter fat quarters to fill in where needed. She loves it so much and I’m really glad to have it off the UFO list!

I was looking at my lists to see what I had to work on. I came across my EPP Party quilt. There’s 13 blocks and I only completed 6 back in 2017 when it was released online. This was a SAL done by Mister Domestic and Pat Bravo in 2017, and the paper pieces were and are still available at paperpieces.com. I realized that with all the EPP projects I have in progress and new ones I’d really like to do, I just wasn’t going to get back to doing this one. So I put the 6 blocks together and used some of the 2.5″ batik strips to make a bigger border. It’s completed quilted and bound and ready to be donated to Community Service at the next guild meeting.

With these 2 now completed and off the list, 10 items are now crossed off my to-do list. 50% quilts and 50% cross stitch! I spent the last few days working on a cross stitch for my sister’s wedding. I asked if I could make the ring pillow for her and while it’s not in pillow form yet, she does love it so far! I’ll get the pillow completed in the next week or so, I’m not worried yet 🙂 It’s hard to tell but I did use Kimberly’s Light Pink 14-count aida from Fat Quarter Shop, my sister is a pink girl! Now I need to find the right pink for a little border around the stitching so I have somewhere to stitch a ribbon down for the rings, plus the back of it.

I’ll be back soon, I pulled out an old EPP hexagon project after I finished the cross stitch yesterday. I swear I blogged about it before, but I couldn’t find it last night. So I need to document the project!

Long Time No See….

Wow, I didn’t realize it had been so long! Let’s see if I can do a life update to explain before I get into the quilting.

Fall of 2022 (back to my last post) changed everything for us. My mom had some medical issues that she couldn’t come back from and ended up going to a nursing home for long term care as we couldn’t take care of her at home any more. All my free time was spent running out to see her multiple times a week along with helping dad out with things at the house. May of 2023, the week after Mother’s Day, she had multiple strokes which the doctors said there was nothing they could do to help her. May 22, 2023 she passed away and we had a lot of things to take care of. Lawyer, bank, cars, etc. It’s been hard to deal with mom not being here the last year, but she’s not hurting anymore and is at peace.

To add on top of the things going on with my mom, my lovely husband broke his leg in January. 2 surgeries and about 4 months later he was back on his feet with a cane and walking. Then over the summer we realized that when he fell and broke his leg he also damaged his shoulder. Surgery for that in October to repair 2 massive tears in his rotator cuff. 2023 was not a good year for our family!

I didn’t have a lot of mojo to quilt the rest of the year, I used to quilt with mom and my heart just wasn’t in it. Oh I still worked on EPP projects, but didn’t get anything close to a finish. I also picked up cross stitch again and spent evenings working on that when I didn’t want to work on EPP. At Christmas, hubby and I decided we weren’t getting each other gifts but did a weekend trip to Kalahari Indoor Water Park as a family gift from Santa instead. To my surprise he handed me a letter basically saying that due to him being home most of the year and not working as much (plus everything with mom) he realized that tomorrow is never guaranteed. We needed to enjoy life more. So he made me a promise that come 2024 we’d figure out how to get me the long arm I’ve been wanting for a REALLY long time. So, April of 2024 I purchased a Handiquilter Moxie XL, the 10′ frame and the overhead light bar. In order to have a place to put it I had to do some MAJOR cleaning in the basement – I had between 15-20 garbage bags, a few things that went on Facebook Marketplace and were sold and a lot of sorting! There’s still a little bit left to clean up and/or sell but the basement is now pretty usable. I also had to call an electrician and get a lot more (and better) lights and outlets in the basement. That turned out WAY better than I expected!

So since the beginning of May I’ve been quite busy working on finishing various quilts. 2 small ones that were donated to the guild community service group, 1 the kids stole almost immediately (waiting since 2013 for quilting), the Pokemon quilt (waiting since March 2020 for quilting) and Cassie’s bed quilt (currently finishing the binding and has only been waiting 2 years for quilting).

In addition to getting all these quilts finished in the last few months, I also got a few cross stitch projects finished. A new line of signs from Fat Quarter Shop that I loved but finished totally differently than they did – of course I quilted them and made them wall hangings for the doors! I finished 3 of them, I have to start working on the fall, Halloween and Christmas ones. I finally finished my quilt-o-logy and stitch-o-logy pieces, instead of buying the wooden spool, my dad made them for me out of wood from our backyard that he’s been making things for us for years. Of course I just realized I haven’t hung them up yet and I don’t remember where I put them after I showed them off at guild! I’ll have too look so I can hang them in my office/sewing room.

Today is the first day of summer break for the kids, they’ve accomplished so much in the last year and a half! Alex is doing great in middle school, Honors ELA and science (8th grade science in 7th grade!), and almost all A’s (a B+ in Honors science). Next year he takes 9th grade science in 8th grade and gets high school credit for it! Cassie is moving to 5th grade next year and is so smart it kills me! She’s been identified as gifted in math and ELA so that should continue into middle school like Alex with honors classes. I’m very proud of both my kids, even though Alex has surpassed my height at 13!

I’ll be around more, I have lots of things to finish and I think my mojo is finally back!