![](https://i0.wp.com/www.kellyskwilts.com/wp-content/uploads/2020/02/2020-02-29-10.54.36.jpg?resize=268%2C356)
I did manage to finish the 2 tasks I wanted to finish this month, I got the doll quilt completely finished AND I completed a block for my Harry Potter quilt. Cassie is thrilled with her new doll quilt, she immediately took it and put it on one of her doll beds. I just did simple loopy quilting in the triangles, I still need to work on my speed with curves, there’s some eyelashing on the back, but Cassie’s doll won’t care!
![](https://i0.wp.com/www.kellyskwilts.com/wp-content/uploads/2020/02/2020-02-29-10.54.59.jpg?resize=192%2C256)
I picked an easy block from my Harry Potter quilt to do, the Deathly Hallows. With this block done I now only have 13 left to do! I might see if I can get another one done today, we’ll see since we have some rearranging to do in Cassie’s room today.
I was hoping to get my first hexagon quilt basted earlier in the month, and I wasn’t able to do that then, however I was able to start working on it today! i should be able to get it finished tonight while I watch some basketball. This will be hand quilted this year!
![](https://i0.wp.com/www.kellyskwilts.com/wp-content/uploads/2020/02/2020-02-29-17.39.25.jpg?resize=300%2C225)
Linking up to Elm Street Quilts.
![](https://i0.wp.com/signatures.mylivesignature.com/54487/354/4DA711DD473527ED8E33C478B2987C66.png?w=840)
Sweet! Thanks for linking up with Elm Street Quilts One Monthly Goal and congrats on your finish!